Consulting
Based on customer requirements and the current state of the IT system, we provide architecture planning and support scheduled demonstrations of product application scenarios.
A professional and comprehensive service system that safeguards your user experience
Based on customer requirements and the current state of the IT system, we provide architecture planning and support scheduled demonstrations of product application scenarios.
Requirements analysis services including, but not limited to, the customer's operating systems, network devices, application systems and other equipment.
On-site or remote deployment and installation services for LogEase products.
A professional R&D team provides tailored development services based on specific customer requirements.
Training for customers on the use of the LogEase product family.
Technical support services after project acceptance.
24/7 support with severity-based response, critical workloads restored within 2 hours, and a 100% resolution commitment.
P1 Critical, P2 Major and P3 Minor, with committed response, restore and resolve times.
| Severity | Response | Restore | Resolve | Resolution rate |
|---|---|---|---|---|
P1Critical |
15min | 2hReal-time 2h; backup 9h; data reliability 18h | <2daysVersion defects: <30 days | 100% |
P2Major |
30min | 2hReal-time 2h; backup 9h; data reliability 18h | <3daysVersion defects: <30 days | 100% |
P3Minor |
60min | 3hReal-time 3h; backup 12h; data reliability 24h | <15daysVersion defects: <30 days | 100% |
Severity is determined by customer or Huawei front-line confirmation. For Huawei key accounts, severity escalates one level.
System outage or business interruption; core functions unavailable or most workloads unusable; severe quality degradation.
Significant latent risk in operation, or issues the customer requires fixed within a set deadline.
Routine maintenance, usage questions, isolated complaints, and alerts or errors without business impact.
Tiered by CVSS base score, with committed response, workaround and patch release times.
| CVSS | Response | Workaround | Patch / release |
|---|---|---|---|
| 7.0 – 10.0 High | ≤24h | ≤7WD | 30CD |
| 4.0 – 6.9 Medium | ≤48h | ≤14WD | 60CD |
| 0.1 – 3.9 Low | ≤48h | ≤30WD | 180CD |
A professional and comprehensive service system that safeguards your user experience
Based on customer requirements and the current state of the IT system, we provide architecture planning and support scheduled demonstrations of product application scenarios.
Requirements analysis services including, but not limited to, the customer's operating systems, network devices, application systems and other equipment.
On-site or remote deployment and installation services for LogEase products.
A professional R&D team provides tailored development services based on specific customer requirements.
Training for customers on the use of the LogEase product family.
Technical support services after project acceptance.
24/7 support with severity-based response, critical workloads restored within 2 hours, and a 100% resolution commitment.
P1 Critical, P2 Major and P3 Minor, with committed response, restore and resolve times.
| Severity | Response | Restore | Resolve | Resolution rate |
|---|---|---|---|---|
P1Critical |
15min | 2hReal-time 2h; backup 9h; data reliability 18h | <2daysVersion defects: <30 days | 100% |
P2Major |
30min | 2hReal-time 2h; backup 9h; data reliability 18h | <3daysVersion defects: <30 days | 100% |
P3Minor |
60min | 3hReal-time 3h; backup 12h; data reliability 24h | <15daysVersion defects: <30 days | 100% |
Severity is determined by customer or Huawei front-line confirmation. For Huawei key accounts, severity escalates one level.
System outage or business interruption; core functions unavailable or most workloads unusable; severe quality degradation.
Significant latent risk in operation, or issues the customer requires fixed within a set deadline.
Routine maintenance, usage questions, isolated complaints, and alerts or errors without business impact.
Tiered by CVSS base score, with committed response, workaround and patch release times.
| CVSS | Response | Workaround | Patch / release |
|---|---|---|---|
| 7.0 – 10.0 High | ≤24h | ≤7WD | 30CD |
| 4.0 – 6.9 Medium | ≤48h | ≤14WD | 60CD |
| 0.1 – 3.9 Low | ≤48h | ≤30WD | 180CD |